スイス
スイス

myGeobrugg

 - Honningsvåg 2012

GBE-3000A - Geobrugg's closest barrier to the North Pole

 - Honningsvåg 2012

Protected road along the fence

 - Honningsvåg 2012

Rock face connection - our adaptation to the terrain

 - Honningsvåg 2012

Thanks to the barrier the road is safe

 - Honningsvåg 2012

Barrier with boulders

 - Honningsvåg 2012

The GBE-3000A is made of SIPDER® spiral wire net S4-130 and of TECCO® G80/4

 - Honningsvåg 2012

The barrier holds back rocks

 - Honningsvåg 2012

Impact in November 2019, the so-called «steinsprangnett og fanggjerde», the support rope separation did its job

 - Honningsvåg 2012

Protected road with barrier holding back rock blocks, November 2019

 

システム

 

システム延長

800 m

 

設置年

2012

状況

Honningsvåg situated in the very North of Norway is its northernmost city. To the Nordkapp (North Cape) it takes a 30 minutes drive. The coastal road was threatened by rockfall.

(steinsprang gjerde)

説明

A GBE-3000A rockfall barrier was installed in 2002 and protects the road since.

顧客名

Statens Vegvesen

落札者

DS

保護対象

道路

腐食防止

亜鉛めっき, ジェオブルッグ スーパーコーティング

担当者の連絡先

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Country Manager Ost- und Zentralschweiz, Liechtenstein

お問い合わせフォーム

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Ticino Country Manager

お問い合わせフォーム