The system was cleaned out and filled again in January 2023. The barrier was cleared again in February 2023, and two or three days later, it was filled again. The barrier was overtopped and remains intact.

 - Hampton Forest Slash Barrier 2021

Looking Upstream - Installing the support ropes

 - Hampton Forest Slash Barrier 2021

Looking downstream at the completed structure which is hardly visible

 - Hampton Forest Slash Barrier 2021

Mid construction

 - Hampton Forest Slash Barrier 2021

The contractor Rock Control installing the ring mesh

 - Hampton Forest Slash Barrier 2021

Looking downstream at the completed structure

 - Hampton Forest Slash Barrier 2021

The slash barrier was first filled in March 2022 and successfully contained a combination of slash and landslide material. The system was then cleaned out and filled again in January 2023

 

設置年

2021

状況

The best management of slash material is at the source. However, even with the best practices, unforeseen extreme weather events can mobilise tree waste and debris into river channels which can cause significant damage to downstream assets. Historically in New Zealand forestry slash-catching barriers are built in-house with various combinations of rope, railway irons and recycled steel members which are then secured back to the bank with deadman anchors.  These structures are effective at stopping small volumes of slash material but risk catastrophic failure from overload subsequently releasing a large volume of material downstream at once. Rayonier Matariki Forests wanted to be proactive and set a new protection benchmark by installing a Geobrugg 1:1 tested and engineered solution, common in Europe but a first in NZ. Although designed for an extreme weather event, the intention is that the barrier is never significantly impacted through slash management at the source and then it can then be dismantled and used at another similar location.

説明

A VX140-H4 was installed in the river channel near the boundary of the 800ha catchment. The barrier height and location were chosen to utilise the large upstream catchment area for log and debris accumulation. The location also has good access for future maintenance/clearing if required. The VX140-H4 System (140kN/m²) was selected to provide sufficient capacity for both the static and dynamic loads of debris and driftwood (slashing) events. Wire rope anchors were used to transfer the loads back into the ground and provide design redundancy should some bank erosion occur. Edge protection was also installed on the top rope to protect the structure in the event of overtopping.

国名

ニュージーランド

落札者

Rock Control

保護対象

その他

担当者の連絡先

Saleh Feidi
 

Saleh Feidi

自然災害防護
衝撃防護
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / アメリカ合衆国

お問い合わせフォーム

Bryant Jackson
 

Bryant Jackson

自然災害防護
衝撃防護
Geobrugg North America, LLC,22 Centro Algodones,87001 Algadones / アメリカ合衆国

お問い合わせフォーム

John Kalejta
 

John Kalejta

Regional Manager Rocky Mountains / Central USA

自然災害防護
衝撃防護
Geobrugg North America, LLC,KS 67226 Wichita / アメリカ合衆国 Regional Manager Rocky Mountains / Central USA

お問い合わせフォーム

Robert Long
 

Robert Long

Regional Sales Manager Southeast

自然災害防護
衝撃防護
Geobrugg North America, LLC,24905 Winterberry LN,60585 Plainfield / アメリカ合衆国 Regional Sales Manager Southeast

お問い合わせフォーム

Pierce Runnels, Civil Engineer
   

Pierce Runnels

Sales Director North America

自然災害防護
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer Sales Director North America

お問い合わせフォーム

Tim Shevlin
 

Tim Shevlin

自然災害防護
衝撃防護
Geobrugg North America, LLC,2050 Timber St S,OR 97302 Salem / アメリカ合衆国

お問い合わせフォーム