スイス
スイス

myGeobrugg

 - Grüner See - Schmiedewalde 2016

Slope protected with TECCO® GREEN

 - Grüner See - Schmiedewalde 2016

Fast re-vegetation thanks to mesh-stabilized soil and mat-retained seeds

 - Grüner See - Schmiedewalde 2016

Detailed aspect view of mesh with a nail and spike plate

 - Grüner See - Schmiedewalde 2016

Close-up with system spike plate and nail

 - Grüner See - Schmiedewalde 2016

Vegetation will take only a few months to cover mesh, spike plates and nails.

 
 

設置年

2016

状況

In the early days of its existence, Schmiedewalde, a small village that neighbours Dresden, was home to a chalk mine that was commercially excavated. Over time, the excavation left a hole that has long since flooded and become known locally as Grüner See (Green Lake).After a heavy rainfall in 2013, one slope of the former surface mine slipped and became severely unstable. A rural road just north of the lake was ruled impassable and required slope stabilization to again be considered safe for passage. The Saxon Superior Mining Agency invited the engineering firm Eckert to develop a permanent solution thereby reassuring the safety of the traffic infrastructure.

地質

Substrate: cohesive artificial infills dating from the times of commercial depletion.

説明

Approximately 50 m of the slope was stabilized from an average height of 10 m (vertical extension). The high-tensile TECCO® GREEN G65/3 mesh was anchored to the slope with approximately 130 soil nails. The soil nails range in length from 3.0 m to 6.0 m and were arranged in a grid pattern of 2.0 m x 2.5 m.
TECCO® GREEN G65/3 consists of combination of a high-tensile steel mesh combined with an erosion control mat. While the TECCO® mesh assures full stabilization of the instable soil the polypropylene (PP) mat serves as grip and substrate for hydroseeding. The solution also provides protection against damage caused by rodents such as beavers.

Datasheet TECCO® GREEN

顧客名

Saxon Superior Mining Agency, Freiberg

落札者

Bergsicherung Freital GmbH

保護対象

道路

腐食防止

ジェオブルッグ スーパーコーティング

担当者の連絡先

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Country Manager Ost- und Zentralschweiz, Liechtenstein

お問い合わせフォーム

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Ticino Country Manager

お問い合わせフォーム