スイス
スイス

myGeobrugg

 - El Florido - Los Ranchos 2019

Drone view of the SL-150 shallow landslide barrier

 - El Florido - Los Ranchos 2019

View of the SL-150 barrier from the road

 - El Florido - Los Ranchos 2019

The barrier from upslope

 - El Florido - Los Ranchos 2019

The SL-150 from down slope

 - El Florido - Los Ranchos 2019

After the first raining day of Hurricane Eta in November 2020

 - El Florido - Los Ranchos 2019

On November 5th, 2020, the barrier is almost filled

 - El Florido - Los Ranchos 2019

The road was clear and without traffic interruptions during and after the hurricane

 

システム

 

システム延長

64 m

 

設置年

2019

状況

Shallow landslide events are a risk at km 36+350 Sector 3, Los Ranchos - El Florido. A gabion wall was not enough to protect the road.

説明

The first dynamic barrier in Honduras was installed on this road: an SL-150 barrier.

国名

ホンジュラス

顧客名

BCIE

エンジニアリング

ACI

落札者

Queiroz Galvao

下請

ICA Inversiones

保護対象

道路

腐食防止

ジェオブルッグ スーパーコーティング

担当者の連絡先

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Western Switzerland

お問い合わせフォーム

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Project Manager Sales Eastern Switzerland

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
モニタリングサービス
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / スイス Country Manager Southern Switzerland

お問い合わせフォーム