スイス
スイス

myGeobrugg

 - El Florido - Los Ranchos 2019

Drone view of the SL-150 shallow landslide barrier

 - El Florido - Los Ranchos 2019

View of the SL-150 barrier from the road

 - El Florido - Los Ranchos 2019

The barrier from upslope

 - El Florido - Los Ranchos 2019

The SL-150 from down slope

 - El Florido - Los Ranchos 2019

After the first raining day of Hurricane Eta in November 2020

 - El Florido - Los Ranchos 2019

On November 5th, 2020, the barrier is almost filled

 - El Florido - Los Ranchos 2019

The road was clear and without traffic interruptions during and after the hurricane

 

システム

 

システム延長

64 m

 

設置年

2019

状況

Shallow landslide events are a risk at km 36+350 Sector 3, Los Ranchos - El Florido. A gabion wall was not enough to protect the road.

説明

The first dynamic barrier in Honduras was installed on this road: an SL-150 barrier.

顧客名

BCIE

落札者

Queiroz Galvao

保護対象

道路

腐食防止

ジェオブルッグ スーパーコーティング

エンジニアリング

ACI

下請

ICA Inversiones

担当者の連絡先

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Country Manager Ost- und Zentralschweiz, Liechtenstein

お問い合わせフォーム

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Ticino Country Manager

お問い合わせフォーム