 - Camarillo Springs Emergency 2015

One of five UX type debris flow barriers already installed - view from the valley side - type UX180-H6

 - Camarillo Springs Emergency 2015

Previous debris flow caused damage to two residences

 - Camarillo Springs Emergency 2015

Previous debris flowed up to the roof line.

 - Camarillo Springs Emergency 2015

Another view of the damages caused by the debris flow.

 - Camarillo Springs Emergency 2015

Installation of posts for the UX-180-H6 barrier - for Geobrugg's debris flow barriers only lightweight equipment is necessary

 - Camarillo Springs Emergency 2015

Installation of the top support rope for the UX-180-H6 type debris flow barrier

 - Camarillo Springs Emergency 2015

More detailed view of fully installed debris flow barrier type VX140-H4

 - Camarillo Springs Emergency 2015

Debris flow barrier type VX140-H4 after the first event - visible perfect state of the already loaded protection

 

システム延長

6 m - 25 m

 

設置年

2015

状況

After wildfires stripped the hills bare of vegetation, torrential rains during the monsoon season of 2014 created significant debris flow events impacting and devastating homes. With the 2015 El Niño approaching, preventive measures were quickly installed in the hillsides above Camarillo Springs as the primary mitigation measure against future debris flows.

説明

The City of Camarillo hired the engineering company Kane Geotech, Inc. (Kane Geotech) to design debris flow mitigation measures. Dr. William Kane designed a plan and specified use of Geobrugg’s debris flow and shallow landslide barriers placed strategically within high risk gullies (barrancas).

At the end of 2015 the City of Camarillo hired Access Limited Construction Co., Inc. (Access Limited) to install the Geobrugg systems. Access Limited worked with Kane Geotech and Geobrugg to have the barriers installed before the rains hit. Geobrugg delivered material and Access Limited completed installation well ahead of the January 31st deadline. El Niño reached California the very next week and the Geobrugg Debris Flow barriers performed as designed.

Retention capacity:

Barranca 1 = 2,000 CY / 1,530 m³
Barranca 2 = 10,000 CY / 7,645  m³
Barranca 3 =12,000 CY / 9,175 m³
Total of 24,000 CY / 18,350 m³

Watch the clip on keyt-tv, Santa Barbara

顧客名

City of Camarillo

落札者

Access Limited Construction Co., Inc.

保護対象

建築

腐食防止

亜鉛めっき, ジェオブルッグ スーパーコーティング

エンジニアリング

Kane Geotech, Inc.

担当者の連絡先

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Country Manager Ost- und Zentralschweiz, Liechtenstein

お問い合わせフォーム

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Ticino Country Manager

お問い合わせフォーム