スイス
スイス

myGeobrugg

 - Borso del Grappa, Veneto 2021

Rockfall barriers above the road

 - Borso del Grappa, Veneto 2021

Rocky slope covered with DELTAX mesh

 - Borso del Grappa, Veneto 2021

Rockface covered with SPIDER mesh

 

システム延長

143 m

 

設置年

2021

状況

Rockfalls are frequent at this section of the road near Treviso. The boulders, from centimetric pebbles up to sizes of 2 cubic meters, are a risk for drivers passing this stretch of road.

説明

To ensure safety, there were installed: 

  • DELTAX® G80/4 mesh adherent to the rock face
  • SPIDER® mesh S3-130 to consolidate an intensely fractured rock tower close to the road 
  • Rockfall barriers GBE-500A and GBE-1000A to prevent rocks from falling onto the highway. 

保護対象

道路

腐食防止

ジェオブルッグ スーパーコーティング

その他設置済み工法

斜面・法面対策工

担当者の連絡先

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Country Manager Ost- und Zentralschweiz, Liechtenstein

お問い合わせフォーム

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Ticino Country Manager

お問い合わせフォーム