スイス
スイス

myGeobrugg

 - Bont Evans Tree Works Scheme 2018

Looking North showing the GBE-100A-R curving with the road

 - Bont Evans Tree Works Scheme 2018

Fence post bases prior to post installation

 - Bont Evans Tree Works Scheme 2018

Concreted and drilled fence post bases for the GBE-100A-R

 - Bont Evans Tree Works Scheme 2018

Fence line angled to mirror the slope angle

 - Bont Evans Tree Works Scheme 2018

Geobrugg Type III spiral rope anchor installed and securing the GBE-100A-R system ropes

 - Bont Evans Tree Works Scheme 2018

Most Southern edge of the site works, showing tree height in the distance

 - Bont Evans Tree Works Scheme 2018

Fence post installed. Mesh shown still attached to fence posts as standard procedure from Geobrugg

 - Bont Evans Tree Works Scheme 2018

GBE-100A-R 2 m high positioned above farmland. Protecting the farm from possible rockfall during tree harvesting

 - Bont Evans Tree Works Scheme 2018

Most Northerly end of site. GBE-100A-R positioned behind farm land

 - Bont Evans Tree Works Scheme 2018

GBE-100A-R 2 m high positioned above road to protect traffic from posible rockfall

 

システム

 

システム延長

930 m

 

設置年

2018

状況

Natural resource Wales need to clear the hillside of trees that have grown too tall and create a safety concern for road users, hill walkers, and tourists. During early stage investigation, many rock outcrops were found on site and concerns were raised of potential rockfall created during the tree harvesting process. The harvesting is undertaken by, and this involves the lifting and dragging of the cut tree to the stockpile. Potentially dislodging rock and debris in the process.

説明

Working alongside Caulmert we were able to supply experience and materials to this complex build and provide a temporary rockfall fence along the full road boundary of the site.

Colin Jones Rock Engineering stalled the GBE-100A-R of two m in height. The ground anchors are IBO R32 bar to depths of 2.5 m. Where rock head was not at surface the fence post bases are constructed of 1000 x 500 x 400 triple reinforced concrete bases. A combination of Geobrugg Type III wire rope anchors or Geobrugg Flexheads for IBO R32 bar drilled to depths of 4.5 m.

顧客名

Natural Resources Wales

落札者

Colin Jones Rock Engineering Ltd

保護対象

道路, 観光用インフラ

腐食防止

亜鉛めっき, ジェオブルッグ スーパーコーティング

エンジニアリング

CAULMERT

担当者の連絡先

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Country Manager Ost- und Zentralschweiz, Liechtenstein

お問い合わせフォーム

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Ticino Country Manager

お問い合わせフォーム