スイス
スイス

myGeobrugg

 - Autopista Cuernavaca-Acapulco 2014

Engaged Debris Flow Barrier as seen looking from the highway

 - Autopista Cuernavaca-Acapulco 2014

The highway with pinpoints of the 8 barrier system locations

 - Autopista Cuernavaca-Acapulco 2014

Map of the two storms' trajectories

 - Autopista Cuernavaca-Acapulco 2014

Devastation at one of the installation locations (before)

 - Autopista Cuernavaca-Acapulco 2014

Destructive damage seen downstream of one of the overflowing debris channels

 - Autopista Cuernavaca-Acapulco 2014

Installation of one of the barriers

 - Autopista Cuernavaca-Acapulco 2014

Engaged Debris Flow Barrier as seen looking toward the highway

 
 

システム延長

5 m - 25 m

 

設置年

2014

状況

At the end of 2013 Hurricane "Ingrid" raced across Mexico from the Gulf. Within 24 hours Tropical Storm "Manuel" likewise raced across Mexico, but from the Pacific Ocean. The devastation resulted in multiple debris flows in known flood channels at three separate stretches of roadway along the Cuernavaca - Acapulco Highway. The flood channels overflowed and caused road closures; therefore, the Federal Department of Roads and
Bridges (CAPUFE) required innovative debris flow systems along 71.1 km of Autopista 95.

説明

This project is the first debris flow barrier system installation in Mexico. During the second half of 2014 and first half of 2015 Geobrugg designed, supplied and oversaw installation of multiple debris flow barriers (as part of 8 systems) ranging from 2.5 m to 10 m high with capacity of 100 to 120 kN/m2. These barriers prevent clogging of storm sewers at the base of the roadway embankments.

CAPUFE required barriers to protect vehicular traffic on this busy major highway after the
2013 devastation caused by the simultaneous occurrence of Hurricane Ingrid and Tropical Storm Manuel. These barriers will:

  • Retain a minor debris flow
  • Retain a large debris flow
  • Create a debris flow breaker
  • Prevent culvert blockages
  • Drain a collection of debris/rubble
  • Divert a channel to correct its course
  • Protect against scour and erosion
  • Protect channel banks from erosion

国名

メキシコ

顧客名

Federal Department of Roads and Bridges (CAPUFE)

エンジニアリング

ACRE SA de CV

落札者

ACRE SA de CV

保護対象

道路

担当者の連絡先

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Western Switzerland

お問い合わせフォーム

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

お問い合わせフォーム

Matthias Denk, Msc. Env. Eng.
 

Matthias Denk

自然災害防護
Hydraulic Engineering
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス , Msc. Env. Eng.

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
モニタリングサービス
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / スイス Country Manager Southern Switzerland

お問い合わせフォーム