スイス
スイス

myGeobrugg

 - Alte Gasse 2018

173.5 meters are protecting the Alte Gasse in Niederurnen

 - Alte Gasse 2018

Works starting in spring 2018

 - Alte Gasse 2018

Below the slope lies the village; various businesses and paths are located in the danger area

 - Alte Gasse 2018

5-meter supports; in the background: the ready-made net is already hanging on the support. In the next installation phase, it will be pulled up like a curtain between the supports

 - Alte Gasse 2018

Tensioning on the valley side, here caused by the angle of the structure

 - Alte Gasse 2018

Installed barrier, in the background the protected buildings

 

システム

 

システム延長

173 m

 

設置年

2018

状況

In the Alte Gasse in Niederurnen, an increasing number of rockfall with consequential damage had occurred. The current official hazard map and a preliminary study (2016) showed considerable risks.

Several possible measures were examined and compared. The solution safety net proved to be the most efficient and cost-effective.

説明

A safety net installation was specified and various framework conditions clarified. Two series of rockfall protection nets, 80 and 90 m long were recommended; 2,000 kJ nets with a height of 5.0 meters. To determine plausible anchor lengths, anchor tensile tests were carried out beforehand.

顧客名

Gemeinde Glarus Nord

落札者

Marti AG

保護対象

道路, 建築, インフラ

腐食防止

ジェオブルッグ スーパーコーティング

エンジニアリング

Raymann AG

担当者の連絡先

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Country Manager Ost- und Zentralschweiz, Liechtenstein

お問い合わせフォーム

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Ticino Country Manager

お問い合わせフォーム