瑞士
瑞士

myGeobrugg

Praia de São Bernadino

边坡稳定 - Praia de São Bernadino 2015

GREENAX® in summer 2018, 3 years after installation

边坡稳定 - Praia de São Bernadino 2015

GREENAX® in 2015, after installation

边坡稳定 - Praia de São Bernadino 2015

DELTAX® G80/3 Drape

边坡稳定 - Praia de São Bernadino 2015

DELTAX® G80/3 Drape

边坡稳定 - Praia de São Bernadino 2015

Overview of the DELTAX® G80/3 Drape

边坡稳定 - Praia de São Bernadino 2015

GREENAX® drape

边坡稳定 - Praia de São Bernadino 2015

TECCO® with horizontal cables and GREENAX® drape

情况

Differing levels of severe erosion of layers of marl and clay led to the formation of unstable layers of sand.

描述

The contractor installed a DELTAX® G80/2 mesh drape to steer the smaller blocks down to the base of the cliff. The contractor installed a GREENAX® erosion control mat just underneath the TECCO® G65/3. The system was anchored with 32 mm nails spaced in a grid pattern of 5 m x 2.5 m.

客户

Agência Portuguesa do Ambiente

承包商

Construções Pragosa

防护对象

Road

腐蚀保护

GEOBRUGG SUPERCOATING, GEOBRUGG ULTRACOATING

工程

Geoárea

分包商

Geocontrole

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址