瑞士
瑞士

myGeobrugg

边坡稳定 - Paseo San Nicolás 2018

The slope with TECCO® G65/3

边坡稳定 - Paseo San Nicolás 2018

Staking out the drilling points

 
 

安装年份

2018

情况

In the residential area of San Nicolas, superficial problems of instability occurred in 2017. The real estate developer of the project asked for a solution to protect the back yards of some houses, which were already inhabited.

地質學

Lime soil layer.

描述

A superficial stabilization with TECCO® G65/3, erosion control mat and nails between 3 to 6 meters was installed.

客户

Portales de Nuevo Emperador S.A.

承包商

NDC

防护对象

Residential area

腐蚀保护

GEOBRUGG SUPERCOATING

工程

Eng. José Harris

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址