瑞士
瑞士

myGeobrugg

Hydraulic Power Plant Nihuil 2 - San Rafael

落石防护 - Hydraulic Power Plant Nihuil 2 - San Rafael 2019

This two-cubic-meter rock block was stopped

落石防护 - Hydraulic Power Plant Nihuil 2 - San Rafael 2019

The powerhouse of the Nihuil Hydraulic Power Plant

落石防护 - Hydraulic Power Plant Nihuil 2 - San Rafael 2019

Maintenance work on the INT rockfall barrier

落石防护 - Hydraulic Power Plant Nihuil 2 - San Rafael 2019

View of the A3S / RXI-100 barrier

 

系统长度

10 m - 70 m

 

安装年份

2019

情况

The powerhouse of the Nihuil 2 Hydraulic Power Plant suffered from rock impacts coming down from the adjacent slopes. In 2007, 10 dynamic rockfall protection barriers were installed to protect the infrastructure.

Systems installed:
1) Barrier A1S: RXI-100. Capacity: 1000 kJ. Length: 10 m. Height: 3,0 m
2) Barrier A2S: RXI-100. Capacity: 1000 kJ. Length: 10 m. Height: 3,0 m
3) Barrier A3S: RXI-100. Capacity: 1000 kJ. Length: 40 m. Height: 3,0 m
4) Barrier B: RXI-150. Capacity: 1500 kJ. Length: 54 m. Height: 3,0 m
5) Barrier C1S: RXI-025. Capacity: 250 kJ. Length: 10 m. Height: 4,0 m
6) Barrier C2S: RXI-025. Capacity: 250 kJ. Length: 10 m. Height: 4,0 m
7) Barrier INF1: RXI-030. Capacity: 300 kJ. Length: 30 m. Height: 4,0 m
8) Barrier INF2: RXI-030. Capacity: 300 kJ. Length: 70 m. Height: 4,0 m
9) Barrier INT: RXI-100. Capacity: 1000 kJ. Length: 60 m. Height: 5,5 m
10) Barrier D1: RXI-075. Capacity: 750 kJ. Length: 20 m. Height: 4,0 m

描述

After a 5-ton block had hit the barrier, a general maintenance of all barriers was carried out in 2019. The works included:

- Cleaning the barriers
- Replacement of a ring net section, retaining cables, secondary meshes, and brakes
- Realignment of side post
- Fixation of cable ties

客户

防护对象

Infrastructure

腐蚀保护

Galvanized

分包商

San Juan Vertical

其他安装的应用程序

落石防护

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址