瑞士
瑞士

myGeobrugg

El Jocotillo electrical substation

边坡稳定 - El Jocotillo electrical substation 2015

View of the slopes around the power station stabilized with TECCO® SYSTEM3.

边坡稳定 - El Jocotillo electrical substation 2015

TECCO® SYSTEM3 perfectly stabilized very steep slopes.

边坡稳定 - El Jocotillo electrical substation 2015

Another perspective of the electrical substation.

边坡稳定 - El Jocotillo electrical substation 2015

TECCO® SYSTEM3 installation: TECCO® G65/3 secured using system spike plates P33/40.

 
 

安装年份

2015

情况

A slope of highly fractured and weathered volcanic rock with continually falling rocks endangered the security of an electrical substation at the bottom of the rock cutting.

描述

Slope stabilization with TECCO® system and anchor bolts D25 [mm] and length 4 [m].

客户

Eolic San Antonio

承包商

Grupo PHI S.A.

腐蚀保护

GEOBRUGG SUPERCOATING

工程

Grupo PHI S.A.

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址