Stabilizacja skarp - Ringelaier Leite St 2127 2015

Single rock stabilization with SPIDER®-System.

Stabilizacja skarp - Ringelaier Leite St 2127 2015

Rockfall triggered by rock scaling.

Stabilizacja skarp - Ringelaier Leite St 2127 2015

Closeup view of the very impressive rock that fell due to rock scaling. Workers were able to successfully remove the rock from the roadway.

Stabilizacja skarp - Ringelaier Leite St 2127 2015

Partial protection with SPIDER®-System.

Stabilizacja skarp - Ringelaier Leite St 2127 2015

Partial protection with TECCO® SYSTEM³.

Stabilizacja skarp - Ringelaier Leite St 2127 2015

Partial protection with SPIDER®-System.

Stabilizacja skarp - Ringelaier Leite St 2127 2015

Detailed view of SPIDER®-System.

Stabilizacja skarp - Ringelaier Leite St 2127 2015

Excess vegetation must be routinely removed so roots cannot cause increasing amount of pressure and trigger instability in the slope.

 

Zastosowane systemy

 

Rok Instalacji / Montazu

2015

Sytuacja początkowa

Some 50 years ago State Road 2127 was widened to accommodate increased traffic volume. Sections of rock face adjacent to the roadway required scaling. The material that was removed was reused as part of the pavement. Because of the stability of the local rock, no protection measures were required.

As a consequence of being moderately to heavily saturated over the past 20 years, crevices in the rock fragments have expanded, in most parts by over one meter. The crevices bisect the steep rock face nearly vertically and caused several rockfall incidents in 2014.

The Bavarian Agency for Environment decided to install several single-block stabilization systems. Further actions have not been planned due to costs and environmental protection.

Geologia

Quartz / Slate

Opis zastosowanego rozwiazania

During rock scaling, those rocks with a volume of up to 6 m³ were removed. Critical sections with reduced stability are now being stabilized with the SPIDER® and TECCO® protection systems.

Inwestor

State Administration Passau

Wykonawca

HTB Kufstein

Chroniony Objekt

Road

Ochrona przeciwerozyjna

GEOBRUGG SUPERCOATING

Projektant

IFB Eigenschenk

Osoba kontaktowa na miejscu

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Szwajcaria Country Manager Ost- und Zentralschweiz, Liechtenstein

Formularz kontaktowy

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Szwajcaria Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Formularz kontaktowy

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Zagrożeniami naturalnymi
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Szwajcaria Project Manager Inspection Services

Formularz kontaktowy

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Szwajcaria Ticino Country Manager

Formularz kontaktowy