スイス
スイス

myGeobrugg

 - Tunnel de Revenez 2016

SPIDER® S3-130 protecting the railway line between Martigny, Switzerland, and Chamonix, France, together with the road to Finhaut, providing a perfect big block stabilization

 - Tunnel de Revenez 2016

Portal of the Tunnel de Revenez - on the left a big amount of scree removed from the railway line

 - Tunnel de Revenez 2016

The site before installation with its steep rock slope directly next to the railway line

 - Tunnel de Revenez 2016

Situation before the stabilization with SPIDER® S3-130 - large loose blocks are endangering the infrastructure below

 - Tunnel de Revenez 2016

Overview before protection measures were implemented

 - Tunnel de Revenez 2016

High tensile SPIDER® S3-130 net was unrolled on the slope before drilling works began. Thus during the top-down drilling the safety of the construction crew was ensured

 - Tunnel de Revenez 2016

To provide optimal blocks stabilization and SPIDER® S3-130 net pre-tensioning, GEWI 32 nails were installed in the dells - where possible

 - Tunnel de Revenez 2016

Detail of the slope stabilization SPIDER® S3-130 net fixed with GEWI 32 nails, border rope and system spike plate P33/40

 - Tunnel de Revenez 2016

At the crest above the stabilized slope, an extra RXE-500 rockfall barrier line was installed to provide extra protection against rockfalls from upper areas

 - Tunnel de Revenez 2016

The RXE-500 rockfall barrier installed directly above the stabilized slope

 - Tunnel de Revenez 2016

SPIDER® S3-130 protecting the railway line and the road, providing perfect stabilzation of the large blocks

 

システム

 

設置年

2016

状況

Directly next to the Tunnel de Revenez is a very steep slope made of large, loose rock blocks which endangered the railway line lying directly below.

地質

Gneiss

説明

To protect the railway line, Martigny-Châtelard and the road lying next to it, 650 m² of SPIDER® S3-130 was installed.  Also installed, was a 3 m high, 24 m long, RXE-500 rockfall barrier.

顧客名

Commune de Finhaut

落札者

ABA Bautec AG

保護対象

道路, 鉄道

腐食防止

ジェオブルッグ スーパーコーティング

エンジニアリング

Silvaplus SA

その他設置済み工法

落石対策工

担当者の連絡先

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Country Manager Ost- und Zentralschweiz, Liechtenstein

お問い合わせフォーム

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Ticino Country Manager

お問い合わせフォーム