スイス
スイス

myGeobrugg

 - Bridge Solldamm 2004

VX debris flow barrier protecting Solldamm bridge, being at the time of installation, one of the first barriers of its kind

 - Bridge Solldamm 2004

Solldamm bridge before installation - visible the outlet which needed protection

 - Bridge Solldamm 2004

The anchoring of the debris flow barrier was executed with a walking excavator with drill rig onboard

 

システム

 

システム延長

16 m - 16 m

 

設置年

2004

状況

The outlet below the bridge has a square size of 1.5 m x 1.5 m. Because of the karstic rocks, heavy rains can lead to large quantities of water flowing through the gully in a very short time, carrying wood and debris with it.

説明

Optimal protection with minimal efforts was found as Geobrugg's VX debris flow or mudslide barrier, being at that time one of the first such installations.

顧客名

Department for Forests, Canton of Grison, Rhine Vally, Schanfigg

落札者

Ribbert AG, Mels

保護対象

道路, インフラ

腐食防止

ジェオブルッグ スーパーコーティング

エンジニアリング

Joggi Felix

担当者の連絡先

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Country Manager Ost- und Zentralschweiz, Liechtenstein

お問い合わせフォーム

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Ticino Country Manager

お問い合わせフォーム