瑞士
瑞士

myGeobrugg

Vallenar North Entrance

边坡稳定 - Vallenar North Entrance 2020

General view with reinforcement

边坡稳定 - Vallenar North Entrance 2020

Close-up spike plate and mesh

边坡稳定 - Vallenar North Entrance 2020

The slope before stabilization

边坡稳定 - Vallenar North Entrance 2020

Drilling of the anchors

边坡稳定 - Vallenar North Entrance 2020

Border anchors

边坡稳定 - Vallenar North Entrance 2020

Detail spike plate

边坡稳定 - Vallenar North Entrance 2020

Protected road with stabilized slope

边坡稳定 - Vallenar North Entrance 2020

Overview of the slope after the installation

 

安装年份

2020

情况

The northern entrance to the city of Vallenar is the principal transit route for all vehicles, buses, or trucks. 12'600 m² embankment along this road had to be stabilized.

描述

Today the slope is stabilized with mesh and spike plates fulfilling the official requirements.

客户

Ministerio de obras publicas

承包商

Ecopsa

防护对象

Road, Residential area

腐蚀保护

GEOBRUGG SUPERCOATING

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址