边坡稳定 - Selo Boyolali 2016

The TECCO® high tensile steel wire mesh stabilizes the steep Lahar slope. Vegetation is already covering the steep hill. The anchored concrete beam at the top absorbs the traffic load and acts as a stiffening element.

边坡稳定 - Selo Boyolali 2016

Rolling down the TECMAT® erosion control and the TECCO® high tensile steel wire net. Diamond shaped spike plates attach the net. Due to the optimized nail pattern, this took only a couple of days.

边坡稳定 - Selo Boyolali 2016

The completed TECCO® slope stabilization. It took the team only four months - congratulations!

边坡稳定 - Selo Boyolali 2016

Frontal view onto the impressive bamboo scaffold: traditional methods meeting newest technologies

边坡稳定 - Selo Boyolali 2016

The entirely green, completely revegetated slope in 2020

 

安装年份

2016

情况

Jembatan Samiran road lies approximately 35 kilometers west from Surakarta. The road widening project that connects Magelang and Boyolali cuts travel time and helps to spur economic growth in the area. In the past, the operation got constraint massively by the occurrence of large slope failure, in which one road lane slipped down to the creek. The site is troublesome due to its steepness and geological condition, due to the intense rainy season and frequent earthquakes.

The road engineers decided on a new effective solution, tested and withstanding the harshness of the site, actively and permanently stabilizing the problematic embankment. Quickly and safely installed in respect of the challenging accessibility. Moreover, blending in with nature: TECCO® System.

TECCO® System is a permanent and active slope stabilization system made of high tensile steel wire mesh in combination with soil nailing or rock bolting.

地質學

Lahar

描述

After the stakeout in collaboration with local experts and Geobrugg engineers, five hardworking drilling team completed drilling works in less than four months. Given the demanding weather conditions, this is an astonishing performance.

2'500 sqm of slope stabilization with TECCO® System mesh and hydroseeding were completed within two weeks.


Green Rehabilitator, the expert in landscape & erosion control services from Semarang, executed the hydroseeding.

客户

Bina Marga

防护对象

Road, Touristic infrastructure

腐蚀保护

GEOBRUGG SUPERCOATING

分包商

PT. Amavi

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址