瑞士
瑞士

myGeobrugg

Road Grabovnica-Grdelica

落石防护 - Road Grabovnica-Grdelica 2015

Installed RXE-1000 rockfall barrier with a protection height of 3.0 m

落石防护 - Road Grabovnica-Grdelica 2015

Installation of RXE-1000 rockfall barrier with a protection height of 3.0 m

落石防护 - Road Grabovnica-Grdelica 2015

Tensioning of a bottom support rope

落石防护 - Road Grabovnica-Grdelica 2015

First line of RXE-1000 rockfall barrier proudly done!

落石防护 - Road Grabovnica-Grdelica 2015

Overview of fully installed RXE-1000 rockfall barrier

落石防护 - Road Grabovnica-Grdelica 2015

After heavy rainfalls in August 2017: the barrier does its work

 

系统长度

105 m - 230 m

 

安装年份

2015

情况

Between Grabovnica and Grdelica the local road and the highway E-75 which leads underneath were endangered by rock falls.

描述

Geobrugg calculated, designed and installed RXE-500 and RXE-1000 barriers and acted as a general contractor. The local population especially estimates the installations as they protect children on their way to school.

客户

Koridori Srbije

承包商

Terna Serbia

防护对象

Road

腐蚀保护

GEOBRUGG SUPERCOATING

分包商

Monterra Rijeka, Croatia

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址