瑞士
瑞士

myGeobrugg

边坡稳定 - M80 Ring Road Upgrade 2011

.

边坡稳定 - M80 Ring Road Upgrade 2011

.

边坡稳定 - M80 Ring Road Upgrade 2011

.

边坡稳定 - M80 Ring Road Upgrade 2011

.

 
 

安装年份

2011

情况

-

描述

The TECCO slope stabilisation system was selected to stabilise a new cutting, as part of the M80 ring road upgrade. The cutting, comprising of highly weathered basalt, was 84 degrees and up to 10m in height. Due to the highly weathered nature of the rock, an erosion control mat was placed underneath the mesh. Approximately 2500m2 of mesh was fixed to 5m long soil nails on a 2 x 2m, staggered pattern.

客户

Tulla Sydney Alliance

防护对象

Road

腐蚀保护

GEOBRUGG ULTRACOATING

工程

Douglas Partners

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址