スイス
スイス

myGeobrugg

Inspection and maintenance of barriers in Lavanchers

 - Inspection and maintenance of barriers in Lavanchers 2022

Laying down snow barriers

 - Inspection and maintenance of barriers in Lavanchers 2022

Framing of the Lavanchers snow stop facility.

 - Inspection and maintenance of barriers in Lavanchers 2022

Snow barriers from a side perspective

 - Inspection and maintenance of barriers in Lavanchers 2022

Snowstop barrier as seen from the top of the mountain

 - Inspection and maintenance of barriers in Lavanchers 2022

GEOBRUGG approved snow fence

 - Inspection and maintenance of barriers in Lavanchers 2022

Photos of the completed construction site at Lavanchers

 
 

システム延長

4350 m

 

設置年

2022

状況

The municipality of Morgex in the Aosta Valley is notorious for its high risk of avalanches, especially the Lavanchers site. At risk are some important road and rail infrastructures for connections between the municipality and neighboring towns. 

After a tragic avalanche event in February 1999, we were commissioned to construct 4350 linear meters of snow barriers with Dk 3.0, 3.5 and 4.0 at an elevation of about 2850 meters.

The snow masses accumulated over the years on the slope have caused wear and tear of some of the basic components of the barriers. For this reason, the Autonomous Region of Valle d' Aosta commissioned the BGP Mountain Scarl Consortium to carry out extraordinary maintenance and restoration operations. 

The latter made use of our technologies to accomplish the task in the best possible way. 

説明

In particular, the following work was followed:

- new anchorages to replace those most stressed
- repositioning and realignment of the uprights and floating plates was carried out
- additional reinforcing ropes were inserted in the internal alignments
- damaged structural elements (ropes, clamps and shackles) were replaced


Thanks to these interventions, the snow barrier system has regained full efficiency and will be able to continue to ensure the protection of the population, settlements and infrastructure on the valley floor.

The experience of Lavanchers represents only the beginning for us at Geobrugg. In fact, we have already developed a new system for monitoring and are trying to promote standardized maintenance procedures.  

保護対象

道路, 鉄道, 居住区

腐食防止

亜鉛めっき

その他設置済み工法

雪崩予防工

担当者の連絡先

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Country Manager Ost- und Zentralschweiz, Liechtenstein

お問い合わせフォーム

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Ticino Country Manager

お問い合わせフォーム