スイス
スイス

myGeobrugg

 - Castlereagh Hwy Windamere, Transport NSW 2020

Close-up view of the newly installed slope protection

 - Castlereagh Hwy Windamere, Transport NSW 2020

During installation of the protective mesh

 - Castlereagh Hwy Windamere, Transport NSW 2020

Street view of the nearly finished installation

 - Castlereagh Hwy Windamere, Transport NSW 2020

Compared to other solutions, such as shotcrete, the mesh is barely visible

 

システム

 

設置年

2020

状況

This section of the Castlereagh Highway is a key route for motorists travelling between Mudgee and Lithgow, and is used by residents, visitors and members of the heavy vehicle industry.  A number of rocks have fallen onto the roadway over the past four years.

説明

Geobrugg supplied 7'800 m² of G80/3 mesh. Around 100 tonnes of rock was removed, and more than 61 bolts up to three metres in length and 7,800 metres of mesh were used to cover the slope. The work is now complete and will ensure this important road remains a safe and reliable route, to serve the community and visitors to the area well into the future.

顧客名

落札者

保護対象

道路

腐食防止

ジェオブルッグ ウルトラコーティング

担当者の連絡先

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Country Manager Ost- und Zentralschweiz, Liechtenstein

お問い合わせフォーム

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Ticino Country Manager

お問い合わせフォーム