Suisse
Suisse

myGeobrugg

Protection contre les chutes de pierres - Samphire Hoe in Dover 2015

Train passing under one of the GBE-1000A (for 1000 kJ) rockfall barriers while under going its final inspection.

Protection contre les chutes de pierres - Samphire Hoe in Dover 2015

Evidence of rock fall below the cliffs before any remedial measures were taken. Visible is a normal chain link fence, which has previously been breached leading to track closures.

Protection contre les chutes de pierres - Samphire Hoe in Dover 2015

Cliffs during TECCO® SYSTEM³ stabilization works.

Protection contre les chutes de pierres - Samphire Hoe in Dover 2015

Rope access techniques in use for drilling and installation of the TECCO® SYSTEM³ stabilization.

Protection contre les chutes de pierres - Samphire Hoe in Dover 2015

Cliff area stabilized with the TECCO® SYSTEM³. Rockfalls triggered here could over top the rockfall barriers below.

Protection contre les chutes de pierres - Samphire Hoe in Dover 2015

GBE-500A (for 500 kJ) rockfall barrier below the cliffs. Note the evidence of small rockfalls already stopped by the barrier.

Protection contre les chutes de pierres - Samphire Hoe in Dover 2015

GBE-1000A (for 1000 kJ) rockfall barriers during installation. Here you can see the final adjustments to the vertical ropes.

Protection contre les chutes de pierres - Samphire Hoe in Dover 2015

Final checks on GBE-1000A rockfall barrier line. Cliff below stabilized with TECCO® SYSTEM³.

Protection contre les chutes de pierres - Samphire Hoe in Dover 2015

Final adjustments on the GBE-1000A rockfall barrier. This barrier offers unbeatable installation simplicity.

Protection contre les chutes de pierres - Samphire Hoe in Dover 2015

Another line of GBE-1000A rockfall barriers during final inspection.

Protection contre les chutes de pierres - Samphire Hoe in Dover 2015

Another view of GBE-1000A rockfall barriers during final inspection.

 

Longueur du système

446 m - 785 m

 

Année d’installation

2015

Situation de départ

The chalk cliffs at Dover form a vital element of the Kent Downs Area of outstanding natural beauty, a nationally important and protected landscape. Samphire Hoe is a new piece of land created by Eurotunnel during the construction of the Channel Tunnel.


Samphire Hoe cutting has a history of rockfall, with previous failures landing on the track.
The design remit was to extend the life of the earthwork such that there is a reduced likelihood of speed restrictions or line closure due to rockfall.


Tactile inspection by Fairhurst revealed the main mechanisms of slope instability to comprise ravelling across the slope face, caused by surface weathering and preferential erosion of weaker chalk horizons, together with more localised toppling, wedge sliding and planar sliding failures of individual blocks.

Description

Working alongside Fairhurst - Consulting Structural and Civil Engineers of Glasgow CAN Geotechnical Ltd. undertook the installation of 13 individual Geobrugg rockfall barriers. The GBE range of barriers were chosen for their ease of installation. Their low anchor forces meant shorter anchors with the resultant decrease in drilling time, allowing for a far shorter program.  The strict vertical drop testing and certifications that come with these fences meant that the only choice of supplier was the world leading technology innovator Geobrugg.


Rockfall analysis was undertaken by Fairhurst and the system energy and height were specified from this point forward. In total 785 metres of GBE-500A and 446 metres of GBE-1000A have been installed between Abbotscliffe and Shakespeare Tunnels. The barriers were used in combination with localised areas of Geobrugg high tensile TECCO® SYSTEM³ flexible facing in total 3150 square metres of TECCO® G65/3 and 350 pieces of P33 system spike plates were installed.

Client

Network Rail Ltd.

Entrepreneur

CAN Geotechnical Ltd.

Objet protégé

Chemin de fer

Protection anticorrosion

galvanisé, GEOBRUGG SUPERCOATING

Ingénierie

Fairhurst - Consulting Structural and Civil Engineers

Autres applications installées

Stabilisation des pentes

Votre contact local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suisse Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Risques naturels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suisse Ticino Country Manager

E-mail