Suisse
Suisse

myGeobrugg

Protection contre les chutes de pierres - Private Client Rock Scaling 2014

.

Protection contre les chutes de pierres - Private Client Rock Scaling 2014

Before Installation

Protection contre les chutes de pierres - Private Client Rock Scaling 2014

.

Protection contre les chutes de pierres - Private Client Rock Scaling 2014

.

Protection contre les chutes de pierres - Private Client Rock Scaling 2014

In front of the fallen boulder

 
 

Longueur du système

143 m

 

Année d’installation

2014

Situation de départ

A client who prefers not to be named operates a 2-story manufacturing facility in the floor of a former rock quarry. In close proximity to the facility is a rock slope topped with trees and boulders. In between the facility and rock slope sits a 3,700 liter liquid nitrogen storage tank. The client required slope remediation in the form of rock-scaling, a manual process of using hand tools to dislodge loose rocks to allow them to safely fall to the base of a slope in a controlled manner.

Description

Geobrugg installed a SPIDER® S4/230 temporary rockfall drape to protect the site from falling boulders. The ~9,000 ft2 drape was anchored using wire rope anchors. A throat was designed at the top to prevent debris from rolling over the top of the netting. Bottom anchorage elements were designed to be removed to facilitate access of labor, equipment, and materials around the base of the slope. Unexpectedly, an approximately 20 ton boulder that was intended to be anchored broke off the slope. Geobrugg’s SPIDER® S4/230 controlled the fall of the roughly 10x8x5 ft3 block so that it came to rest at the toe of the slope without damaging the workers, the mesh, the storage tank, or the facility.

Client

A client who prefers to remain undisclosed

Entrepreneur

Ameritech Slope Constructors

Objet protégé

Bâtiment, Carrière / Mines

Ingénierie

Haley & Aldrich

Votre contact local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suisse Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Risques naturels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suisse Ticino Country Manager

E-mail