Etats-Unis
Etats-Unis

myGeobrugg

Circuits de course / Pistes d’essai - Las Vegas Strip Circuit 2023

Start-Finish-Line with Geobrugg mobile Pit Wall system.

Circuits de course / Pistes d’essai - Las Vegas Strip Circuit 2023

Koval Lane with mobile debris fence system.

Circuits de course / Pistes d’essai - Las Vegas Strip Circuit 2023

Pit Wall fence with Pit Wall concrete barriers.

Circuits de course / Pistes d’essai - Las Vegas Strip Circuit 2023

Geobrugg's mobile Debris Fence behind Tecpro barriers.

Circuits de course / Pistes d’essai - Las Vegas Strip Circuit 2023

Las Vegas Boulevard (The Strip) with Debris Fence.

Circuits de course / Pistes d’essai - Las Vegas Strip Circuit 2023

Pit Wall Gate

Circuits de course / Pistes d’essai - Las Vegas Strip Circuit 2023

Mobile Debris Fence with the 6m Gate.

Circuits de course / Pistes d’essai - Las Vegas Strip Circuit 2023

Turn 7 with Geobrugg's Debris Fence.

Circuits de course / Pistes d’essai - Las Vegas Strip Circuit 2023

Mobile Debris Fence system with SAFER barriers.

Circuits de course / Pistes d’essai - Las Vegas Strip Circuit 2023

Mobile Debris Fence along the Las Vegas Strip Circuit.

 

Longueur du système

- 12500 m

 

Année d’installation

2023

Situation de départ

The Las Vegas Strip Circuit is a temporary street circuit in Las Vegas / Nevada, designed by the Tilke team around Carsten & Hermann Tilke. 

The circuit layout runs through Harmon Avenue, Koval Lane, Sands Avenue, the MSG Sphere area and the world-famous Las Vegas Strip (Las Vegas Boulevard). The circuit is 6.20 km (3.85 miles) long, has 17 turns, and the longest straight is 1.0 km (0.6 miles) long. The maximum speed of 350.5 km/h (217.8 mph) was recorded during the Formula 1 race debut on November 18, 2023. 

Description

Geobrugg supplied various safety products at the Las Vegas Strip Circuit due to its location next to grandstands, public roads, pedestrian walkways, casinos and buildings.

Debris fence systems:

  • - Mobile debris fence panel
  • - Mobile Pit Wall fence panel

Concrete barrier production

  • - Key elements for concrete barrier production
  • - Key elements for Pit Wall barrier production

Gates: 

  • - 6m Gates
  • - Pit Wall Gate

Services:

  • - Detail Layout Design
  • - Production Training for concrete and Pit Wall barriers
  • - Assembly Training for fence panels
  • - Supervision during construction 
  • - Installation training for Flexible Opening
  • - Task Force 

 We delivered more than 34 containers of material to Las Vegas, USA. 

Ingénierie

Autres sociétés participantes

Votre contact local

Marty Hunt
   

Marty Hunt

Sales & Project Manager Motorsport

Motorsport
Geobrugg Partner - Motorsport Logistics & Technology L.L.C.,PO Box 138,IN 46167 USA Pittsboro / Etats-Unis Sales & Project Manager Motorsport

E-mail