Suisse
Suisse

myGeobrugg

Laves torrentielles et coulées de boue - Huallalolén, Seca and Ñilhue ravines 2022

Huallalolen barriers

Laves torrentielles et coulées de boue - Huallalolén, Seca and Ñilhue ravines 2022

Huallalolen barrier installation

Laves torrentielles et coulées de boue - Huallalolén, Seca and Ñilhue ravines 2022

Ring net, Huallaolen barrier

Laves torrentielles et coulées de boue - Huallalolén, Seca and Ñilhue ravines 2022

Huallalolen barrier 1

Laves torrentielles et coulées de boue - Huallalolén, Seca and Ñilhue ravines 2022

Huallalolen barrier 2

Laves torrentielles et coulées de boue - Huallalolén, Seca and Ñilhue ravines 2022

Huallalolen barrier 3

Laves torrentielles et coulées de boue - Huallalolén, Seca and Ñilhue ravines 2022

Secs barrier

Laves torrentielles et coulées de boue - Huallalolén, Seca and Ñilhue ravines 2022

Nilhue barrier 1

Laves torrentielles et coulées de boue - Huallalolén, Seca and Ñilhue ravines 2022

Nilhue barrier 2

Laves torrentielles et coulées de boue - Huallalolén, Seca and Ñilhue ravines 2022

Nilhue barrier 3

 

Longueur du système

10 m - 20 m

 

Année d’installation

2022

Situation de départ

End of January 2021, the metropolitan area of Santiago endured heavy rainfalls of more than 116 mm. A phenomenon that had not occurred since 1933. This, plus the scarce vegetation in the mountains and a zero isotherm above 3,500 meters, activated several streams and gullies.

In the commune of Lo Barnechea the water affected homes, streets, roads, and infrastructure and caused emergency works.

Description

The solution consists of seven dynamic barriers of the VX-type installed in the three streams affected mainly by the floods.

  • Seca gully: 1 VX-80-H4 barrier 16 meters wide and 4 meters high
  • Ñilhue gully: 1 VX-160-H6 barrier 13 meters wide and 6 meters high and 2 VX-140-H4 barriers 12 meters wide and 4 meters high
  • Huallalolén gully: 3 VX-140-H4 barriers 18 meters wide and 4 meters high

The retention capacity of all seven ring net barriers is 6’900 m³.

Client

Directorate of Hydraulic Works DOH

Objet protégé

Route/Rue, Zone résidentielle, Infrastructure

Protection anticorrosion

galvanisé, GEOBRUGG SUPERCOATING

Autres sociétés participantes

Pucará S.A.

Votre contact local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suisse Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Risques naturels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suisse Ticino Country Manager

E-mail