Suisse
Suisse

myGeobrugg

Exploitation minière / Tunnel - Hellas Gold 2019

Debris flow barrier after installation, complete with abrasion protection and winglets

Exploitation minière / Tunnel - Hellas Gold 2019

Before placing the anchors in concrete

Exploitation minière / Tunnel - Hellas Gold 2019

Setting up the posts and fastening the pre-assembled ring net

Exploitation minière / Tunnel - Hellas Gold 2019

Nearly finished - winglets and abrasion protection are next to come

 

Systèmes

 

Année d’installation

2019

Situation de départ

At the Hellas Gold mine, protection from debris flow had become necessary in phase 1 (2019 - 2027) area.

Description

Installation of a 4 meters high, u-shaped ring net debris flow barrier

Pays / Région

Grèce

Client

Hellas Gold

Objet protégé

Carrière / Mines, Autres

Protection anticorrosion

GEOBRUGG SUPERCOATING

Votre contact local

René Müller
   

René Müller

Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suisse Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

E-mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern Switzerland

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG Project Manager Sales Eastern Switzerland

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Risques naturels
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / Suisse Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Suisse Country Manager Southern Switzerland

E-mail