Suisse
Suisse

myGeobrugg

Stabilisation des pentes - Brown Mountain 2021

High tensile wire mesh protecting the road from small debris and rocks

Stabilisation des pentes - Brown Mountain 2021

TECCO® mesh adapts perfectly to the uneven ground

 

Systèmes

 

Année d’installation

2021

Situation de départ

Mountain passes are some of the more challenging parts of the road network to maintain. They are regularly inspected for stability and these assessments guide requirements for maintenance. Heavy rains in early autumn resulted in landslips on the aged granite slopes of Brown Mountain, resulting in natural material including huge boulders to fall onto the travel lanes.

Description

A $2.2 million slope stabilisation project at this location started in mid-April to remove selected boulders, trees and unstable natural material. The area will also receive treatments that include installing soil nails into the slopes which are then tightened against the slope with steel mesh and erosion matting for support to prevent further slips and erosion. Important road maintenance will also be completed.

Client

Entrepreneur

Objet protégé

Route/Rue

Protection anticorrosion

GEOBRUGG ULTRACOATING

Votre contact local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suisse Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Risques naturels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suisse Ticino Country Manager

E-mail