ANA Chosica - 22 barriers for nine valleys

Laves torrentielles et coulées de boue - ANA Chosica - 22 barriers for nine valleys 2016

Attaching the net to the cable

Laves torrentielles et coulées de boue - ANA Chosica - 22 barriers for nine valleys 2016

Installing abrasion protection (in front a brake ring) ...

Laves torrentielles et coulées de boue - ANA Chosica - 22 barriers for nine valleys 2016

... which protects the rope when the net is filled and there is an overflow.

Laves torrentielles et coulées de boue - ANA Chosica - 22 barriers for nine valleys 2016

Final check executed by the installation team.

Laves torrentielles et coulées de boue - ANA Chosica - 22 barriers for nine valleys 2016

The lower barrier with a top width of 60 m. Project specific UX-barrier line-up with 5 posts.

Laves torrentielles et coulées de boue - ANA Chosica - 22 barriers for nine valleys 2016

Serial alignment acoording to the multilevel approach (planned with DEBFLOW software).

Laves torrentielles et coulées de boue - ANA Chosica - 22 barriers for nine valleys 2016

Protection system and protected object.

Laves torrentielles et coulées de boue - ANA Chosica - 22 barriers for nine valleys 2016

Site visit with representatives of the client.

Laves torrentielles et coulées de boue - ANA Chosica - 22 barriers for nine valleys 2016

The proud team aside of its record installation in record time - full satisfaction.

Laves torrentielles et coulées de boue - ANA Chosica - 22 barriers for nine valleys 2016

2017, one year later: Approximately 7000 m³ debris were stopped in this barrier.

Laves torrentielles et coulées de boue - ANA Chosica - 22 barriers for nine valleys 2016

2017, one year later: The second barrier level contains approximately 3000 m³ debris.

Laves torrentielles et coulées de boue - ANA Chosica - 22 barriers for nine valleys 2016

2017, one year later: View uphill from 2nd level to first level of the filled barriers.

Laves torrentielles et coulées de boue - ANA Chosica - 22 barriers for nine valleys 2016

2017, one year later: The city is close to the activated barriers.

Laves torrentielles et coulées de boue - ANA Chosica - 22 barriers for nine valleys 2016

2017, one year later: The fourth level of the barriers is nearly not affected and still fully functional.

Laves torrentielles et coulées de boue - ANA Chosica - 22 barriers for nine valleys 2016

September 2018: Repair works for the anchors

 
 

Longueur du système

6 m - 60 m

 

Année d’installation

2016

Situation de départ

In the area east of Lima, Peru, annually recurring rains due to the El Niño phenomenon caused mudslides and landslides in the past. At the end of February 2016, Geobrugg installed 22 debris flow barriers that today protect people and infrastructure in the nine valleys of the Chosica Region.

Description

22 barriers were installed between mid-November 2015 and end of February 2016. Noteworthy are the means of transportation: By air from Switzerland to Lima and by muscle power over the final kilometers. The lightweight of the systems was advantageous for both types of transport.

Local authorities show details of the largest installation of this kind of Latin America in a film (in Spanish).

March 2017

A year after the installation of 22 debris flow barriers in Chosica El Niño Costero has struck again, with the worst storms of the past 30 years in the north of Peru. Causing heavy rains, floods, and landslides, which have caused in fatalities and damage to properties.

The 22 barriers have functioned reliably. One of the images shows a 55 meters stretch as one of the 4 levels of the barrier system. Two of these barriers are filled to 95 percent capacity, which is a volume of 10,000 m³. The multilevel design allows an increased retention volume, meaning that there is still capacity in the downstream barriers. The most important thing is that the residential area has not been damaged and there have been no deaths or injuries.

September 2018
Desnivel Perú S.A.C, Spanish-Swiss parent company, concluded the restoration and replacement works of affected elements after the Niño Costero period that shook the Peruvian coast in 2017.

The works consisted of two stages: The removal of material accumulated after the rainy season. And the replacement and restoration of the elements damaged by the debris flow and by robberies.

The following pictures illustrate 2016, 2017 and 2018.

Pays / Région

Pérou

Client

ANA Chosica

Ingénierie

TDM S.A.

Entrepreneur

TDM S.A.

Objet protégé

Route/Rue, Bâtiment

Protection anticorrosion

GEOBRUGG SUPERCOATING

Votre contact local

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Risques naturels
Impact Protection
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / Etats-Unis Regional Manager California

E-mail

Bryant Jackson
 

Bryant Jackson

Regional Sales Manager Northeast

Risques naturels
Impact Protection
Geobrugg North America, LLC,22 Centro Algodones Regional Sales Manager Northeast

E-mail

John Kalejta
 

John Kalejta

Regional Manager Rocky Mountains / Central USA

Risques naturels
Impact Protection
Geobrugg North America, LLC,KS 67226 Wichita / Etats-Unis Regional Manager Rocky Mountains / Central USA

E-mail

Robert Long
 

Robert Long

Regional Sales Manager Southeast

Risques naturels
Impact Protection
Geobrugg North America, LLC,24905 Winterberry LN,60585 Plainfield / Etats-Unis Regional Sales Manager Southeast

E-mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

Sales Director North America

Risques naturels
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer Sales Director North America

E-mail

Tim Shevlin
 

Tim Shevlin

Regional Sales Manager Pacific Northwest and Hawaii

Risques naturels
Impact Protection
Geobrugg North America, LLC,OR 97302 Salem / Etats-Unis Regional Sales Manager Pacific Northwest and Hawaii

E-mail