Weißsee Gletscherbahnen, Stubach bei Uttendorf (Salzburg)

 - Weißsee Gletscherbahnen, Stubach bei Uttendorf (Salzburg) 2016

Short set made up of two edge nets. In the background on the left, you can see the Grünsee mid-station at 1,742 m above sea level. The ropeway then continues to Rudolfshütte at 2,315 m above sea level.

 - Weißsee Gletscherbahnen, Stubach bei Uttendorf (Salzburg) 2016

Overview of the project area with the potential starting zones and the ropeway line to be protected. The double supports are most at risk. They are to be protected against any flowing avalanches that may occur by an additional diversion dam made of natural stone.

 - Weißsee Gletscherbahnen, Stubach bei Uttendorf (Salzburg) 2016

The existing wooden avalanche guards have been severely damaged due to frequent rockfalls and weathering. They not longer guarantee the protection required and are therefore being removed.

 - Weißsee Gletscherbahnen, Stubach bei Uttendorf (Salzburg) 2016

The avalanche nets from the SPIDER® Avalanche system have not just proven their capabilities as an ideal avalanche construction – they have also been successfully tested against rockfall. This durability when faced with falling rocks is the key advantage of the Geobrugg system.

 - Weißsee Gletscherbahnen, Stubach bei Uttendorf (Salzburg) 2016

The pressure plate forms the ideal foundation for the supports in terrain with a 45° incline and a rocky substrate. It is loosely held in position with two ground ropes anchored on the slope, on leveled terrain measuring around 0.7 m x 0.7 m.

 - Weißsee Gletscherbahnen, Stubach bei Uttendorf (Salzburg) 2016

The avalanche nets are fixed to the uphill rope anchor with a retention rope, which is cut to size at the factory, with the corresponding number of loops. The rope anchor used is relatively insusceptible to the rockfalls which happen regularly here.

 - Weißsee Gletscherbahnen, Stubach bei Uttendorf (Salzburg) 2016

The SPIDER® net surface is supplied from the factory with a screen-like fixed fine mesh and prevents the snow from penetrating.

 - Weißsee Gletscherbahnen, Stubach bei Uttendorf (Salzburg) 2016

View of the supports to be protected on the Weißsee glacier ropeway.

 - Weißsee Gletscherbahnen, Stubach bei Uttendorf (Salzburg) 2016

From the gondola, the avalanche nets blend seamlessly into the alpine landscape – they are hardly noticeable.

 
 

システム延長

8 m - 28 m

 

設置年

2016

状況

Falling rocks and weathering had damaged the previous wooden avalanche protection structure. The original protective function had to be restored. Furthermore, other hazardous areas had to be secured in order to provide better protection for the entire ropeway system.

In the project which was originally submitted, the intention was to construct massive avalanche wedges made of reinforced concrete. These were designed to directly protect double supports 21a and 21b, as well as support 22. On account of the enormous dimensions of this structure, the associated costs, and the considerable impact on the landscape – in a conservation area on the edge of the Hohe Tauern National Park, a new protection project was created.

説明

The new protection concept combines three elements:
•    permanent protection against avalanches through an avalanche protection structure       made of snow nets
•    temporary protection against avalanches through avalanche blasting in conjunction with
•    an avalanche diversion dam to protect objects

Overall, eight sets of SPIDER® Avalanche snow nets with a total length of 140 meters are being erected in three potential avalanche starting zones. With this measure, it is only necessary to construct a 35-meter-long and approximately 3-meter-high dam made of locally acquired, heavy rubble.

With the hardly visible snow nets and natural dam, the authorities were extremely satisfied in terms of conservation of nature and the landscape.

顧客名

Weißsee Gletscherwelt GmbH

落札者

Felbermayr Bau GmbH & Co KG, Abt. FST, Niederlassung Lienz

保護対象

観光用インフラ

腐食防止

亜鉛めっき, ジェオブルッグ スーパーコーティング

エンジニアリング

Ingenieurkonsulent DDipl.-Ing. Stefan Oberndorfer

担当者の連絡先

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Country Manager Ost- und Zentralschweiz, Liechtenstein

お問い合わせフォーム

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Ticino Country Manager

お問い合わせフォーム