myGeobrugg
2017
After a tropical storm this slope behind a house showed erosion problems
Soil layer
The contractor proposed an erosion control with DELTAX® mesh plus erosion control mat. They were fixed to the slope with 2-meter bolts.
n.a.
Precision Blasting & Construction Ltd.
居住区
ジェオブルッグ ウルトラコーティング
Revo Skelton