スイス
スイス

myGeobrugg

 - Nonguen Channel 2021

Stabilized channel slope

 - Nonguen Channel 2021

Spike plate P33 on the stabilized slope

 - Nonguen Channel 2021

Connection clips T3

 - Nonguen Channel 2021

Front view of the stabilized slope

 

システム

 

設置年

2021

状況

The west slope of the Nonguén Canal was unstable, as evidenced by numerous cracks in the concrete. This instability was a danger to the homes adjacent to the canal.

説明

In order to stabilize the slope TECCO® system was installed in all the sectors of the canal that showed fissures, cracks or settlements. After this installation, a shotcrete layer was placed on top of the stabilization system.

顧客名

保護対象

インフラ

腐食防止

ジェオブルッグ スーパーコーティング

担当者の連絡先

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Country Manager Ost- und Zentralschweiz, Liechtenstein

お問い合わせフォーム

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Ticino Country Manager

お問い合わせフォーム