Suisse
Suisse

myGeobrugg

Stabilisation des pentes - Pescante Agulo 2015

First step, installing the TECCO® mesh hanging from the top are of the cliff

Stabilisation des pentes - Pescante Agulo 2015

... with vertical rope access techniques.

Stabilisation des pentes - Pescante Agulo 2015

Complementary solution RXE-3000 H = 5m L = 50m (20 m + 30 m)

Stabilisation des pentes - Pescante Agulo 2015

Detail of the verticality of the slope

Stabilisation des pentes - Pescante Agulo 2015

Installation view from the top area

Stabilisation des pentes - Pescante Agulo 2015

Preparation of the drilling by climbing techniques.

Stabilisation des pentes - Pescante Agulo 2015

Vertical connection between mesh panels, using stainless steel T2 clips

 

Année d’installation

2015

Situation de départ

Rock wedges slide from a quasi-vertical cliff, very near from the sea cost

Description

TECCO® Stainless consists of 3 mm stainless wire (1.4462 / AISI 318) high tensile strength (1'650MPa), all complementary fasteners and accessories are also made of stainless steel.This first of its kind of solution, is further supplemented by solid bar anchors fiberglass 25 - 32 mm and lengths between 4 and 6 m, spaced every 12 m².

Client

Coast Authorities

Entrepreneur

SACYR

Objet protégé

Infrastructure touristique

Ingénierie

OHS

Autres sociétés participantes

Geobrugg Iberica, S.A.

Autres applications installées

Protection contre les chutes de pierres

Votre contact local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suisse Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Risques naturels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suisse Ticino Country Manager

E-mail