Suisse
Suisse

myGeobrugg

Protection contre les chutes de pierres - Military Base Protection - Facatativá 2016

Frontal view of the barrier

Protection contre les chutes de pierres - Military Base Protection - Facatativá 2016

During installation

Protection contre les chutes de pierres - Military Base Protection - Facatativá 2016

Side view of the barrier

Protection contre les chutes de pierres - Military Base Protection - Facatativá 2016

Installed rockfall protection barrier GBE-100A-R

 

Systèmes

 

Longueur du système

50 m

 

Année d’installation

2016

Situation de départ

The Colombian National Army was looking for a system capable of holding back blocks that fell onto one of its facilities. Users and workers at the building were at risk due to the proximity to the slope.

Description

WARCO/Geobrugg consulted, supplied and installed a rockfall barrier GBE-100A-R of 50 meters length and 2 meters height.

Client

Ejercito de Colombia

Entrepreneur

WARCO S.A.S

Objet protégé

Bâtiment

Votre contact local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suisse Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Risques naturels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suisse Ticino Country Manager

E-mail