瑞士
瑞士

myGeobrugg

边坡稳定 - Zion Hill 2015

TECCO® SYSTEM3 after all protection works are finished.

边坡稳定 - Zion Hill 2015

Installed TECCO® SYSTEM3.

边坡稳定 - Zion Hill 2015

TECCO® G65/3 rolls during installation.

边坡稳定 - Zion Hill 2015

Slope nails installation using portable, suspended drill rig. For extra protection drilling works were executed through TECCO® G65/3 mesh.

 
 

安装年份

2015

情况

Rockfall from the channel wings meant risk for the channel workers.

描述

Slope stabilization with TECCO® SYSTEM3 mesh and anchors with 32 mm diameter every 2.5 m.

客户

Autoridad del Canal de Panamá - ACP

承包商

Alvarado & Düring International

腐蚀保护

GEOBRUGG SUPERCOATING

工程

Autoridad del Canal de Panamá - ACP

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址