瑞士
瑞士

myGeobrugg

Löwenwand - German Railway (DB)

边坡稳定 - Löwenwand - German Railway (DB) 2010

Since 2010, 30,000 square metres of TECCO® SYSTEM have been protecting the railway line on the Löwenwand. In addition, rockfall and debris flow barriers have been installed.

边坡稳定 - Löwenwand - German Railway (DB) 2010

Completed stabilization with TECCO® G65/3

边坡稳定 - Löwenwand - German Railway (DB) 2010

In some areas, where the rockface was not stabilized, barriers and catch nets were installed

边坡稳定 - Löwenwand - German Railway (DB) 2010

In two canyons debris flow barriers VX-060L protect the railway from rockfall

 
 

安装年份

2010

情况

-

地質學

Basalt Residual soil/coluvium

Weathered, jointy
Local instabilities, slidings
Critical global stability
New cut
Stabilization of a block stone wall
Critical superficial stability

描述

Lieferung des Materials

客户

DB Netz AG

承包商

HTB Baugesellschaft m.b.H.

防护对象

Railway

腐蚀保护

GEOBRUGG SUPERCOATING

工程

gbm - Gesellschaft für Baugeologie und -meßtechnik mbH

其他安装的应用程序

泥石流和滑坡防护

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址