瑞士
瑞士

myGeobrugg

边坡稳定 - JiJi Tour Line 2020

TECCO® G65/3 prevents unstable rocks from falling onto the railway line

边坡稳定 - JiJi Tour Line 2020

Rocky slope above the railway line before the installation of the mesh

边坡稳定 - JiJi Tour Line 2020

During installation of the mesh

边坡稳定 - JiJi Tour Line 2020

Installation of the spike plates which are part of the slope stabilizing system

边坡稳定 - JiJi Tour Line 2020

The flexible mesh following the contour of the terrain

 
 

安装年份

2020

情况

Due to heavy rain in 2020, the JiJi Railway encountered a slope failure (at Sta.K18+300). A rigid H-pile fence could not guarantee the required safety for the railway.

描述

The Taiwan Railways Administration (TRA) decided to stabilize the rockface with TECCO System.

承包商

Jin Xin Engineering Co., Ltd.

防护对象

Railway

腐蚀保护

GEOBRUGG SUPERCOATING

工程

United Geotech, INC.

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址