美国
美国

myGeobrugg

边坡稳定 - Bridger Coal Mine 2004

Protective mesh installed on the rockface slope

边坡稳定 - Bridger Coal Mine 2004

Installation of TECCO® G65/3

边坡稳定 - Bridger Coal Mine 2004

Installed TECCO®

边坡稳定 - Bridger Coal Mine 2004

Mesh covering the rock

 
 

安装年份

2004

情况

At this open pit mine, tunnel portals were put to go underground to follow coal seams. These tunnel portals are located at the bottom of a high wall.

描述

The high wall was draped with TECCO® System mesh to protect personnel and equipment during construction and operation of the portals.

客户

Private

承包商

Yenter Companies

防护对象

Mine / Quarry

腐蚀保护

GEOBRUGG SUPERCOATING

工程

Seegmiller International

其他安装的应用程序

矿井/隧道

本地联系方式

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / 美国 Regional Manager Northeast

联系地址

Saleh Feidi
 

Saleh Feidi

Regional Manager California

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / 美国 Regional Manager California

联系地址

John Kalejta
 

John Kalejta

Regional Manager Central US

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / 美国 Regional Manager Central US

联系地址

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / 美国 Regional Manager Southeast

联系地址

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

自然災害防護
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

联系地址

Tim Shevlin
 

Tim Shevlin

Sales Director

自然災害防護
Geobrugg North America, LLC,Salem OR 97302 / 美国 Sales Director

联系地址