Suíça
Suíça

myGeobrugg

Moffet Creek, Oregon, T35 barrier on concrete guardrail

Proteção contra desprendimentos - Moffet Creek, Oregon, T35 barrier on concrete guardrail 2018

T35 Rockfall barrier attached to concrete guardrail

Proteção contra desprendimentos - Moffet Creek, Oregon, T35 barrier on concrete guardrail 2018

Simple attachment of structural mesh G65/3 mm using T3 clips

Proteção contra desprendimentos - Moffet Creek, Oregon, T35 barrier on concrete guardrail 2018

Simple attachment of support ropes to post

Proteção contra desprendimentos - Moffet Creek, Oregon, T35 barrier on concrete guardrail 2018

Top and bottom support rope terminate at shackle and anchor plate into concrete guardrail

Proteção contra desprendimentos - Moffet Creek, Oregon, T35 barrier on concrete guardrail 2018

Post attachment requires two bolts. Four holes provided for field drilling anchors around concrete reinforcement.

 
 

Comprimento do sistema

- 100 m

 

Ano de instalação

2018

Situação inicial

After the severe 2018 Eagle Creek fire, a T35 rockfall barrier was utilized for temporary rockfall protection for the I-84 interstate during a larger scaling operation and TECCO® drape installation. Triptych Construction in conjunction with the Oregon Department of Transportation utilized Geobrugg North America's novel modification attaching the standard low energy T35 rockfall barrier to common concrete guardrail. 

Descrição

The T35 system is independently tested in 1:1 full-scale test for rockfall up to 35 kJ providing easy to install, cost-effective rockfall protection. The standard post has been redesigned to attach to standard concrete guardrail and available for quick supply and installation by qualified contractors.  

Promotor

Triptych Constructon

Contratante

Triptych Construction

Objecto protegido

Estrada

Proteção contra a corrosão

GEOBRUGG SUPERCOATING

Empreteiro

Oregon Department of Transportation

Outras aplicações instaladas

Estabilização de taludes, Cercas móveis para rodovias

O seu contacto local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suíça Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suíça Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Riscos naturais
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suíça Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suíça Ticino Country Manager

E-mail