Szwajcaria
Szwajcaria

myGeobrugg

Tidong-I Hydro Electric Project, Himachal Pradesh

Ochrona przed obrywami skalnymi - Tidong-I Hydro Electric Project, Himachal Pradesh 2019

GBE 2000A rockfall barrier

Ochrona przed obrywami skalnymi - Tidong-I Hydro Electric Project, Himachal Pradesh 2019

The location

Ochrona przed obrywami skalnymi - Tidong-I Hydro Electric Project, Himachal Pradesh 2019

Installation of QUAROX® Rolled Cable Net at the power house

Ochrona przed obrywami skalnymi - Tidong-I Hydro Electric Project, Himachal Pradesh 2019

Drilling work at the power house

Ochrona przed obrywami skalnymi - Tidong-I Hydro Electric Project, Himachal Pradesh 2019

QUAROX® RCN during installation at the surge shaft

Ochrona przed obrywami skalnymi - Tidong-I Hydro Electric Project, Himachal Pradesh 2019

Construction works at the surge shaft

Ochrona przed obrywami skalnymi - Tidong-I Hydro Electric Project, Himachal Pradesh 2019

Erection work of GBE-2000A rockfall barrier

Ochrona przed obrywami skalnymi - Tidong-I Hydro Electric Project, Himachal Pradesh 2019

GBE-2000A Rockfall Barrier

Ochrona przed obrywami skalnymi - Tidong-I Hydro Electric Project, Himachal Pradesh 2019

Snowfall after installation of QUAROX®. The solution is not interfering with the natural beauty of this place

 

Rok Instalacji / Montazu

2019

Sytuacja początkowa

The project is located in the Himachal Pradesh state of India and almost 40 km to the east of Kalpa. The power house below a cut and natural slope needed protection against rock falls. Similar to the power house the surge shaft cut also required to be supported by rockfall barrier and rock fall net.

Geology:  The project area lies in Mehbar and Maldi gneisses comprised of kyanite and psamatic gneisses with bands of schist and quartzite. These are intruded by basic and acidic rocks. Some of the rocks are well folliated. The general trends are North-South with moderate trend towards East. These are transacted by number of joints of which the folliation and strike joints are most predominantly followed in frequency by steeply dipping transverse joints.

Opis zastosowanego rozwiazania

GBE-2000A of length 50 meters and GBE-1000A of length 30 meters were installed.

The authorities also decided to install flexible slope stabilization system QUAROX® rolled cable net, with GEOBRUGG SUPERCOATING and high-tensile rockfall protection netting DELTAX® G80/2 (Secondary mesh)

Area: 13500 sq.m. Variable grid pattern and fully grouted rock bolts of diameter 32 mm / length 3 m, fully threaded with top 6" galvanized material, Grade EN8, Ft = 500 N/mm².

Inwestor

Statkraft

Wykonawca

Pioneer Foundation Engineers Pvt. Ltd.

Chroniony Objekt

Road, Infrastructure, Other

Ochrona przeciwerozyjna

GEOBRUGG SUPERCOATING

Inne zainstalowane aplikacje

Stabilizacja skarp

Osoba kontaktowa na miejscu

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Szwajcaria Country Manager Ost- und Zentralschweiz, Liechtenstein

Formularz kontaktowy

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Szwajcaria Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Formularz kontaktowy

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Zagrożeniami naturalnymi
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Szwajcaria Project Manager Inspection Services

Formularz kontaktowy

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Szwajcaria Ticino Country Manager

Formularz kontaktowy