Stabilizacja skarp - Laúca Hydro Power Plant 2017

Overview project site: Visible are the 600 meters long rockfall barrier RXI-050 and the slopes above partially covered with TECCO® SYSTEM³

Stabilizacja skarp - Laúca Hydro Power Plant 2017

Top of the slope having the form of a cliff consisting tower structures

Stabilizacja skarp - Laúca Hydro Power Plant 2017

Complicated self-drilling nails INCO 32 TD type installation. All works required rope access

Stabilizacja skarp - Laúca Hydro Power Plant 2017

TECCO³ SYSTEM³ during installation works: drilling rig at the nearly vertical rockface with spike plates not yet tightened

Stabilizacja skarp - Laúca Hydro Power Plant 2017

Installation of TECCO® SYSTEM³ on top of the slope having the form of a cliff

Stabilizacja skarp - Laúca Hydro Power Plant 2017

Top of the slope stabilization with high tensile mesh TECCO® G65/3 and self-drilling nails INCO 32 TD

Stabilizacja skarp - Laúca Hydro Power Plant 2017

TECCO® SYSTEM³ during installation: visible unrolling of the high tensile TECCO® G65/3 mesh on the slope

Stabilizacja skarp - Laúca Hydro Power Plant 2017

Overview of the Laúca Hydro Power Plant construction site from above the RXI-050 rockfall barrier line

Stabilizacja skarp - Laúca Hydro Power Plant 2017

TECCO® SYSTEM³ during installation: visible scale of the project

Stabilizacja skarp - Laúca Hydro Power Plant 2017

RXI-050 rockfall barrier during installation: slope above is already protected with TECCO® SYSTEM³

Stabilizacja skarp - Laúca Hydro Power Plant 2017

ROCCO® high tensile net fastening being a part of the rockfall barrier RXI-050

Stabilizacja skarp - Laúca Hydro Power Plant 2017

Fully installed RXI-050 rockfall barrier. Slope above and below the barrier line is stabilized with the TECCO® SYSTEM³

Stabilizacja skarp - Laúca Hydro Power Plant 2017

Overview of the installation site: visible geomorphology of the whole slope

Stabilizacja skarp - Laúca Hydro Power Plant 2017

Aerial view of the construction site with a perfect overview of the rockfall barrier RXI-050 lines

 

Zastosowane systemy

 

Rok Instalacji / Montazu

2017

Sytuacja początkowa

The Lauca Hydro Power Plant is located at the foot of a steep slope.  The slope requires stabilization to avoid causing damage to the facilities and equipment.

Geologia

Project site consists of the following types of rock:

  • colluvium
  • silicified sandstone
  • porous sandstone
  • sandstone-siltstone transition
  • siltstone
  • gneiss from moderately fractured to strongly altered

Opis zastosowanego rozwiazania

The following solutions were used for slope protection:

Top of the cliffs and tower shaped structures partially protected with TECCO® System:

  • high tensile mesh: TECCO® G65/3
  • self-drilling nails: INCO 32 TD
  • nail diameter: 32 mm
  • nail length: 4.0 m
  • nail pattern: 1.4 x 1.4 m

Tower shaped structures partially protected with TECCO® System and SPIDER® System:

  • high tensile mesh: TECCO® G65/3
  • high tensile net SPIDER S4-230
  • tower structure width below 3.0 m: nail pattern 1.4 x 1.4 m
  • tower structure width over 3.0 m: nail pattern 3.0 x 1.4 m

At the base of the tower structures:

  • high tensile mesh: TECCO® G65/3
  • self-drilling nails: INCO 32 TD
  • nail diameter: 32 mm
  • nail length: 4.0 m
  • nail pattern: 5.0 x 5.0 m

Regular area of the slope, between rockfall barrier line and top of the cliffs:

  • high tensile mesh: TECCO® G65/3
  • self-drilling nails: INCO 32 TD
  • nail diameter: 32 mm
  • nail length: 4.0 m
  • nail pattern: 5.0 x 5.0 m

Below the rockfall barrier, ca. 10 m high zone directly above slope cut:

  • high tensile mesh: TECCO® G65/3
  • self-drilling nails: INCO 32 TD
  • nail diameter: 32 mm
  • nail length: 8.0 m
  • nail pattern: 2.0 x 2.0 m

Self drilling nails were used due to  fractured condition of the  rock slope.

Passive rockfall protection barrier:

  • rockfall protection barrier RXI-050
  • height: 4 m
  • length: 600 m in 3 sections of: 180 m / 240 m / 180 m

 

Inwestor

Aproveitamento Hidroeléctrico de Laúca

Chroniony Objekt

Road, Building, Infrastructure, Other

Ochrona przeciwerozyjna

GEOBRUGG SUPERCOATING

Projektant

Intertechne Consultores S.A.

Inne przedsiębiorstwa

Tecnasol Fundações E Geotecnia, S.A.

Inne zainstalowane aplikacje

Ochrona przed obrywami skalnymi

Osoba kontaktowa na miejscu

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Szwajcaria Country Manager Ost- und Zentralschweiz, Liechtenstein

Formularz kontaktowy

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Szwajcaria Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Formularz kontaktowy

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Zagrożeniami naturalnymi
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Szwajcaria Project Manager Inspection Services

Formularz kontaktowy

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Szwajcaria Ticino Country Manager

Formularz kontaktowy