スイス
スイス

myGeobrugg

 - Löwenwand - German Railway (DB) 2010

Since 2010, 30,000 square metres of TECCO® SYSTEM have been protecting the railway line on the Löwenwand. In addition, rockfall and debris flow barriers have been installed.

 - Löwenwand - German Railway (DB) 2010

Completed stabilization with TECCO® G65/3

 - Löwenwand - German Railway (DB) 2010

In some areas, where the rockface was not stabilized, barriers and catch nets were installed

 - Löwenwand - German Railway (DB) 2010

In two canyons debris flow barriers VX-060L protect the railway from rockfall

 

システム

 

設置年

2010

状況

-

地質

Basalt Residual soil/coluvium

Weathered, jointy
Local instabilities, slidings
Critical global stability
New cut
Stabilization of a block stone wall
Critical superficial stability

説明

Lieferung des Materials

顧客名

DB Netz AG

落札者

HTB Baugesellschaft m.b.H.

保護対象

鉄道

腐食防止

ジェオブルッグ スーパーコーティング

エンジニアリング

gbm - Gesellschaft für Baugeologie und -meßtechnik mbH

その他設置済み工法

土石流・斜面崩壊対策工

担当者の連絡先

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Country Manager Ost- und Zentralschweiz, Liechtenstein

お問い合わせフォーム

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Ticino Country Manager

お問い合わせフォーム