アメリカ合衆国
アメリカ合衆国

myGeobrugg

 - Campomanes-Lena 2019

The León-Gijón railway line in Asturias protected by a ring-net barrier

 - Campomanes-Lena 2019

Tunnel portal and rockfall barrier above

 - Campomanes-Lena 2019

The barrier easily adepts to the ground

 

システム

 

システム延長

160 m

 

設置年

2019

状況

At the highly frequented León-Gijón railway line large blocks were a threat to the track and its users.

説明

A dynamic ring net barrier, an RXE-5000, 6 m high, was installed. This barrier is certified according to the new EAD 340059000106 and therefore has European Technical Evaluation and CE marking. Also, it is certified according to Swiss standards.

顧客名

ADIF (Administrador de Infraestructuras Ferroviarias)

落札者

Montaña Restauración Medioambiental, S.L.

保護対象

鉄道

腐食防止

ジェオブルッグ スーパーコーティング

担当者の連絡先

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / アメリカ合衆国 Regional Manager Northeast

お問い合わせフォーム

Saleh Feidi
 

Saleh Feidi

Regional Manager California

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / アメリカ合衆国 Regional Manager California

お問い合わせフォーム

John Kalejta
 

John Kalejta

Regional Manager Central US

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / アメリカ合衆国 Regional Manager Central US

お問い合わせフォーム

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / アメリカ合衆国 Regional Manager Southeast

お問い合わせフォーム

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

自然災害防護
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

お問い合わせフォーム

Tim Shevlin
 

Tim Shevlin

Sales Director

自然災害防護
Geobrugg North America, LLC,Salem OR 97302 / アメリカ合衆国 Sales Director

お問い合わせフォーム