Suisse
Suisse

myGeobrugg

Protection contre les chutes de pierres - Piwniczna Zdrój DK87 2016

GBE-500-A rockfall barrier along the state road DK87 Piwniczna Zdrój

Protection contre les chutes de pierres - Piwniczna Zdrój DK87 2016

Loose rock above the road

Protection contre les chutes de pierres - Piwniczna Zdrój DK87 2016

Over 350 meters of road protected by rockfall barriers

 

Longueur du système

108 m - 252 m

 

Année d’installation

2016

Situation de départ

During the construction of the DK87 national road on the section Piwniczna Zdrój, rock fragments falling from the Kicaz mountain slope were identified as a threat to the traffic.

Description

To protect the road from rock chips and boulders, GBE-100-A-R and GBE-500-A rock catch fences were installed in four locations. The total length of all barriers is 360 meters.

Check also the Piwniczna Zdrój DW97 slope protection project.

Client

GDDKiA Oddział Kraków

Entrepreneur

BMD Sp. z o.o.

Protection anticorrosion

galvanisé

Ingénierie

BMD Sp. z o.o.

Votre contact local

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Suisse Country Manager Cantons AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Risques naturels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Suisse Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Risques naturels
Ingénierie Hydraulique
Exploitation minière / Tunnel
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Suisse Ticino Country Manager

E-mail