瑞士
瑞士

myGeobrugg

边坡稳定 - Lago Emperador 2018

View of wall with steel support structure

边坡稳定 - Lago Emperador 2018

Wall with supportive mesh structure

边坡稳定 - Lago Emperador 2018

Outside view of the protected wall

 

安装年份

2018

情况

The wall above the concrete mixer showed signs of deterioration.

描述

After a structural analysis: Steel cables and DELTAX® 80/2 mesh support the wall and transfer the forces to the ground through spiral rope anchors placed on the slopes lateral to the wall.

客户

Concretos Emperador S.A.

承包商

IDM Ingeniería y Construcción S.A.

防护对象

Building, Infrastructure, Other

腐蚀保护

GEOBRUGG SUPERCOATING, INOX / STAINLESS

工程

IDM Ingeniería y Construcción S.A.

分包商

NDC

其他安装的应用程序

冲击防护

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址