瑞士
瑞士

myGeobrugg

Kiratpur-Ner Chowk National Highway-21, Punjab & Himachal Pradesh

边坡稳定 - Kiratpur-Ner Chowk National Highway-21, Punjab & Himachal Pradesh 2015

TECCO® SYSTEM³ after installation - slope is fully protected

边坡稳定 - Kiratpur-Ner Chowk National Highway-21, Punjab & Himachal Pradesh 2015

Overview of the construction site

边坡稳定 - Kiratpur-Ner Chowk National Highway-21, Punjab & Himachal Pradesh 2015

Slope cut at km 147+020 showing the geology conditions of the construction site

边坡稳定 - Kiratpur-Ner Chowk National Highway-21, Punjab & Himachal Pradesh 2015

Extremely weathered ground conditions at km 147+780 before stabilization works

边坡稳定 - Kiratpur-Ner Chowk National Highway-21, Punjab & Himachal Pradesh 2015

Installation works in progress at km 147+780 - slope is already particularly stabilized with TECCO® SYSTEM³

边坡稳定 - Kiratpur-Ner Chowk National Highway-21, Punjab & Himachal Pradesh 2015

Installation and drilling works in progress, at the slope angle of 75°

边坡稳定 - Kiratpur-Ner Chowk National Highway-21, Punjab & Himachal Pradesh 2015

Laying of TECCO® G65/3 mesh under the supervision of Geobrugg specialist

边坡稳定 - Kiratpur-Ner Chowk National Highway-21, Punjab & Himachal Pradesh 2015

Slope covered with TECCO® G65/3 mesh along with MultiMat 030 to support further vegetation

边坡稳定 - Kiratpur-Ner Chowk National Highway-21, Punjab & Himachal Pradesh 2015

Closer look at the slope completely stabilized with TECCO® SYSTEM³ - visible mesh pretensioning effect, minimizing further deformations

边坡稳定 - Kiratpur-Ner Chowk National Highway-21, Punjab & Himachal Pradesh 2015

TECCO® G65/3 mesh together with anti-erosion Tenax Multimat 030 after installation completion

 
 

安装年份

2015

情况

A total of 8 different chainage locations with a cumulative area of approximately 50000 m² of slopes required stabilization. The client required an active slope stabilization system with greening which should look aesthetically appealing. This project is a part of the project 4-Laning of Kiratpur-NerChowk section of National Highway-21 (from km 21.55 to km 154.00) in the state of Punjab & Himachal Pradesh.

描述

TECCO® SYSTEM³ was nailed by fully threaded rock-bolts, with minimum dia of 28 mm to a maximum of 40 mm and hot-dip galvanized. The nail pattern was variable with 1.9 x 1.9 m to a maximum of 2.4 x 2.4 m at different chainage points. The installation was carried out by trained professionals having expertise in drilling and civil work, under the expert supervision of Geobrugg India Pvt. Ltd. to ensure maximum safety with correct methodology also guiding the site engineers and sub-contractors for optimum effects and results.

客户

IL&FS Engineering & Construction Company Ltd.

承包商

M/s Pioneer Foundations Engineers, M/s Sai Gr Impex Pvt. Ltd., M/s Afond Construction Pvt. Ltd.

防护对象

Road

腐蚀保护

GEOBRUGG SUPERCOATING

工程

ITNL & Grusamar Ltd.

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址