瑞士
瑞士

myGeobrugg

Autoverlad BLS Goppenstein

落石防护 - Autoverlad BLS Goppenstein 2012

.

落石防护 - Autoverlad BLS Goppenstein 2012

.

落石防护 - Autoverlad BLS Goppenstein 2012

.

落石防护 - Autoverlad BLS Goppenstein 2012

.

 

系统长度

640 m

 

安装年份

2012

情况

The area where the cars are waiting was endangered from rockfall.

描述

to protect the waiting cars (before they were loaded on to the train through the Lötschbergtunnel), 640 m Barriers were installed. The absorbtion-energies go up to 5000 kJ (16 t with >90 km/h).

客户

BLS AG

承包商

.

防护对象

Road, Railway, Building

腐蚀保护

Galvanized, GEOBRUGG SUPERCOATING

工程

.

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址