 - Olt Valley, km 198+000 - 226+000 2009

Two lines of the 6 m high rockfall barrier type RXI-200 and the protected road DN7

 - Olt Valley, km 198+000 - 226+000 2009

During final installation works at the 5 m high RXI-200 rockfall barrier

 - Olt Valley, km 198+000 - 226+000 2009

Geobrugg RXI systems offer fast and simple installation what is highly appreciated by contractors

 - Olt Valley, km 198+000 - 226+000 2009

The 6 m high rockfall barrier type RXI-200 during installation without traffic interruption

 - Olt Valley, km 198+000 - 226+000 2009

The 6 m high rockfall barrier type RXI-200 after installation

 - Olt Valley, km 198+000 - 226+000 2009

The same, 120 m long RXI-200 rockfall barrier one year after installation - perfectly integrated in the nature

 - Olt Valley, km 198+000 - 226+000 2009

RXI-200 rockfall barrier anchored directly in the rock face - special solution without border post

 - Olt Valley, km 198+000 - 226+000 2009

The 5 m high rockfall barrier type RXI-100 from another side of the Olt River

 - Olt Valley, km 198+000 - 226+000 2009

This RXI-100 rockfall barrier is also a protection against debris flow

 - Olt Valley, km 198+000 - 226+000 2009

The RXI-200 rockfall barrier which was tested on site

 - Olt Valley, km 198+000 - 226+000 2009

RXI-200 rockfall barrier direct rock connection and TECCO® SYSTEM³ stabilization

 - Olt Valley, km 198+000 - 226+000 2009

The same, on site tested, RXI-200 rockfall barrier and TECCO® SYSTEM³ as mix of passive and active solutions

 - Olt Valley, km 198+000 - 226+000 2009

The same, on site tested, RXI-200 rockfall barrier and TECCO® SYSTEM³ one year after installation visible from the other side of the Olt River

 - Olt Valley, km 198+000 - 226+000 2009

5 m high RXI-100 rockfall barrier with rockface connection and SPIDER® S4-230 high tensile net fixing the big rock blocks on the slope

 - Olt Valley, km 198+000 - 226+000 2009

Another area with RXI-200 rockfall barrier and TECCO® SYSTEM³ as mix of passive and active solutions

 - Olt Valley, km 198+000 - 226+000 2009

Again RXI-200 rockfall barrier and TECCO® SYSTEM³ - here the barrier protects also against debris flow

 - Olt Valley, km 198+000 - 226+000 2009

View of the situation through the high tensile ROCCO® ringnet

 

システム延長

25 m - 120 m

 

設置年

2009

状況

National road no. 7 (DN7) is one of the most important routes through the Carpathian Mountains, with heavy traffic. The Olt River runs parallel to the DN7 with high mountains, directly next to the road. In winter and spring rockfalls occur regularly. Also with unstable slopes, torrents and avalanches the risk of accidents was high. 

This project was originally developed with five concrete canopies for rockfall protection. Due to costs and other restrictions, a modern solution using high tensile steel wire was chosen. After further investigation, 23 dangerous areas were found and had to be protected using two types of protection systems: active and passive.

 

説明

As passive protection measures, AXI and RXI rockfall barriers with dynamic capacity ranging from 500 to 3000 kJ were chosen for the following sectors:

1. km 198+523.72 - 198+571.00
RXI-050

  • capacity: 500 kJ
  • length: 20 m
  • height: 2.5 m

2. km 200+166 - 200+193
RXI-200

  • capacity: 2.000 kJ
  • length: 30 m
  • height: 6 m

3. km 200+207 - 200+219
RXI-200

  • capacity: 2.000 kJ
  • length: 30 m
  • height: 6 m

4. km 201+384 - 200+427
RXI-300

  • capacity: 3.000 kJ
  • length: 50 m
  • height: 6 m

5. km 206+004 - 206+034
RXI-100 and RXI-300

  • capacity: 1000 and 3000 kJ
  • length: 25 m and 30 m
  • height 5 m and 6 m

See also the other projects of the Olt Valley.

顧客名

Compania Naţională de Administrare a Infrastructurii Rutiere (C.N.A.I.R.) – Directia Regionala de Drumuri si Poduri Craiova (D.R.D.P.)

落札者

Sächsische Bau GmbH Dresden Germany, Sibiu Branch

保護対象

道路, 鉄道

腐食防止

亜鉛めっき, ジェオブルッグ スーパーコーティング

エンジニアリング

Institut de Proiectări pentru Transporturi Auto, Navale și Aeriene (I.P.T.A.N.A.) București

下請

AlpConstruct – Vâlcea

その他設置済み工法

斜面・法面対策工, 土石流・斜面崩壊対策工

担当者の連絡先

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / アメリカ合衆国 Regional Manager Northeast

お問い合わせフォーム

Saleh Feidi
 

Saleh Feidi

Regional Manager California

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / アメリカ合衆国 Regional Manager California

お問い合わせフォーム

John Kalejta
 

John Kalejta

Regional Manager Central US

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / アメリカ合衆国 Regional Manager Central US

お問い合わせフォーム

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / アメリカ合衆国 Regional Manager Southeast

お問い合わせフォーム

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

自然災害防護
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

お問い合わせフォーム

Tim Shevlin
 

Tim Shevlin

Sales Director

自然災害防護
Geobrugg North America, LLC,Salem OR 97302 / アメリカ合衆国 Sales Director

お問い合わせフォーム