 - Navachab Mine 2002

General overview of the rock face within the mine

 - Navachab Mine 2002

The muck pile after the failure.; material from the oxidized soft lower schist

 - Navachab Mine 2002

Boulders retained by the net

 - Navachab Mine 2002

Material held back by the rockfall barrier

 

システム延長

150 m

 

設置年

2002

状況

In 2003 a 100 m³ fall of ground (FOG) occurred at Navachab Gold Mine, originated in the oxidized schist from an older failure scar. The FOG material was held back on the 1050 m catch bench. The elastic catch fence that was installed on the catch bench prevented overspill of the material into the pit. The risk to life though was very low as the pit bottom was closed to mining operations at the time.

説明

The failure, though small, was monitored by the early warning system. It was fortuitous that the failure occurred near one of the early warning systems extensometers and progression of the failure was recorded using this extensometer. The last geotechnical report to management stated that collapse of this material was imminent. The FOG activated the early warning system, and the pit was successfully evacuated, and all personnel congratulated on their prompt reaction to the early warning system. No injuries or equipment damage occurred during this FOG.

顧客名

Anglo Gold

落札者

Nautical Steel/Navachab Mine

保護対象

鉱山/採石場, その他

エンジニアリング

SRK Consulting Engineers

その他設置済み工法

鉱山および採石場

担当者の連絡先

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Country Manager Ost- und Zentralschweiz, Liechtenstein

お問い合わせフォーム

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / スイス Ticino Country Manager

お問い合わせフォーム